Notes
Slide Show
Outline
1
UPSTAIRS DOWNTOWN
  • ARCHITECTURAL ASSESSMENT
  • “Why Grow Out , Grow Up”


  • Mike Jackson, FAIA
  • Illinois Historic Preservation Agency
2
ARCHITECTURAL ASSESSMENT
  • The architectural target of this program is the vacant upper story space that exists in tens of thousands of small floor plate buildings in America’s older downtowns.


3
ECONOMIC FEASIBILITY
  • The goal of this session is to make you aware of the architectural, regulatory and fiscal variables that affect feasibility.


4
YOUR BUILDING IS:
  • Real Estate (land & improvements)
  • A part of the community wealth (tax base)
  • A piece of architecture
  • A part of history (many former owners/uses)
  • A ecological asset: embodied energy
    • Host of environmental hazards

5
VALUE JUDGMENTS
  • Land value
  • Building value (current market)
  • Depreciated value (adjusted basis)*
    • Increases with improvements
    • Decreases with depreciation
    • Trigger value for tax credit eligibility
  • Insured value (replacement?)
  • Assessed value (property tax basis)
6
ECO VALUE
  • Embodied Energy
  • A typical 2 story downtown building has the embodied energy equivalent of:
    • 24,000 gallons of gasoline or
    • 230 tons of CO2
7
CODES & STANDARDS
    • Building Codes
    • Locally adopted, national model
    • Illinois Plumbing Code
    • Illinois Accessibility Code
    • American with Disabilities Act
    • Secretary of the Interior’s Standards (Historic)
    • Code triggers based upon funding source
    • Ex: HUD funding and lead paint
8
LOCATION  Characteristics
  • City, county, state, township
  • Street address (Highway?)
  • Lot size & setbacks (survey?)
  • Zoning district
    • Parking requirement
      • No on-site requirement in most downtowns
    • Zero lot line
    • Rear yard
9
LOCATION Characteristics
  • Topography
  • Flood plain
  • Seismic
  • Local designations:
    • Main Street district
    • Historic District
  • Special districts
    • TIF, SSA, Enterprise
10
UTILITIES & SERVICES
  • Electric
  • Gas
  • Water (size and pressure)
  • Sewer (interior and exterior adequacy)
  • Telephone
  • Cable
  • High speed Internet
  • Trash pick up
11
BUILDING PROFILE
  • Size
    • Area
    • Stories
  • Construction type (from building code)
  • Structural system (check for adequacy)
  • Architectural attributes that are code triggers
    • Number of exits
    • Access to light and ventilation
12
BUILDING PROFILE
  • CONSTRUCTION TYPE (IBC 2000)
    • Type III (based upon fire resistance of building elements)
      • Exterior walls are noncombustible materials and interior building elements are of any material permitted by this code.
13
BUILDING PROFILE
  • STRUCTURE (IBC 2000)
  • Residential 40 psf
  • Stairs and exits 100 psf
      • One & two family dwelling 40 psf
    • Office 50 psf, Corridor above 1st fl 80 psf
        • Lobbies and first floor corridor 100 psf
    • Original design (archaic materials)
    • Condition assessment
14
LIGHT & VENTILATION
15
LIGHT & VENTILATION
16
LIGHT & VENTILATION
17
EGRESS REQUIREMENTS
    • Three-story buildings require two means of egress from the third floor. Exits have to directly connect to a public right-of-way.
18
BUILDING USE
  • Current use (zoning classifications)
    • First floor
    • Upper floors
  • Historic use (city directory, Sanborn map)
    • First floor
    • Upper floors
  • Vacant (last known legal use)
  • Kitchen and bath indicate residential use
19
HISTORIC USE
  • Sanborn fire insurance maps are a valuable tool to evaluate a buildings original fire safety design attributes.
20
ENVIRONMENTAL ASSESSMENT
  • Asbestos
  • Lead Paint
  • Underground storage tanks
  • Other
    • Prior industrial use (Sanborn map, history)
    • Bird droppings
    • Mold
21
ENVIRONMENTAL ASSESSMENT
  • ASBESTOS:
  • Regulated by:
    • US Environmental Protection Agency
      • NESHAP (National Emission Standards for Hazardous Air Pollutants)
    • Illinois Department of Public Health
      • Contractor certification & practices
      • Demolition & Renovation notification
      • Special rules on floor tile
    • Illinois Environmental Protection Agency



22
ENVIRONMENTAL ASSESSMENT
  • ASBESTOS – “trigger” points
    • Friable and non-friable materials
    • Minimum quantities of materials
  • USEPA – NESHAP does not apply to:
    • Residential buildings with 4 our fewer units
  • Demolition & Renovation
    • Demolition is the removal of a structural member
    • Notification requirement
23
ENVIRONMENTAL ASSESSMENT
  • ASBESTOS
    • Survey when demolition or renovation is planned (qualified contractor) $
    • Abatement (qualified contractor) $ - $$$
    • Floor tile demolition (special qualifications) $
    • Critical issue: $$$
    •   Asbestos in plaster


24
ENVIRONMENTAL ASSESSMENT
  • LEAD PAINT
  • REGULATORY
    • Illinois Dept. of Public Health
      • Residential units
    • Illinois Environmental Protection Agency
      • Disposal
    • OSHA (worker protection) Commercial bldgs
    • HUD Guidelines (most well known)
      • Apply only when HUD funding is involved
25
ENVIRONMENTAL ASSESSMENT
    • LEAD PAINT
    • Definition: >0.5% lead content
    • Most common in buildings before 1950
    • Exterior woodwork most common source
    • Friction surfaces (windows)
    • Most downtown buildings will have lead paint.
    • Hazard based upon condition and likelihood of becoming lead dust.
26
ENVIRONMENTAL ASSESSMENT
  • LEAD PAINT (IDPH)
    • Identification (XRF, chips, dust wipe)
    • Risk assessment
    • Treatment options
      • No hazard from intact materials
      • Interim control (special paint coatings)
      • Abatement (cover, remove paint or element)
        • Requires specialized contractors) $$$
    • Disposal (requirements based upon quantity)
27
ENVIRONMENTAL ASSESSMENT
  • MOLD
    • This is a new relatively new topic of environmental concern, for which rules and regulations are currently being developed.
    • Controversy over the definition
    • Confusing market place
    • Technical note:
      • Plaster has a high lime content and is not a likely host for mold. Drywall, with its cellulose (paper) surface is a very good host for mold.
28
HISTORIC CLASSIFICATION
  • Historic designation status:
    • Individual building
    • Contributing building to a district
    • National Register
    • Local landmark
    • Eligibility (50 years +)
    • Age (pre 1936)
  • Architectural style classification
29
HISTORIC CLASSIFICATION
  • Historic status allows building code alternatives.
    • Status based upon eligibility
    • HAARGIS – Illinois’ on-line tool to access historic status
    • http://gis.hpa.state.il.us/hargis/
30
HISTORIC DESIGN
  • Secretary of the Interior’s Standards for Rehabilitation
  • Local commission review of exterior
31
ARCHITECTURAL FEATURES
  • Roof
    • Slope
    • Condition/warranty
    • Gutters & downspouts
    • Structural adequacy
  • Foundation
    • Material
    • Structural adequacy
32
ARCHITECTURAL FEATURES
  • Facades:  Primary, Secondary, Tertiary





      • Condition assessment
      • Special features (architectural)
      • Time period of significance/alterations
33
ARCHITECTURAL FEATURES
    • Interiors
      • Primary, secondary, tertiary
        • Condition assessment
      • Special features
        • High ceilings
        • Architectural elements
        • Skylights
        • Fireplaces


34
FEASIBILITY FACTORS
  • Balancing economic are architectural factors
    • Capacity limits of the existing building
    • Cost of improving the capacity
  • Financial limits based upon
    • Expected return on investment
    • Availability of incentives

35
FEASIBILITY FACTORS
  • Cost is directly related to complexity of use:
  • Storage
  • Residential (owner’s unit)
  • Multi-family residential (unit count)
  • Office
  • Retail
  • Assembly (restaurant)
36
FEASIBILITY FACTORS
  • What does the building want to be?
    • Original use
      • Residential, high adequacy if two story
      • Office, medium adequacy (access)
      • Assembly, high inadequacy (access & fire safety)

37
FEASIBILITY FACTORS
  • Site Factors:
    • Parking
      • Covered or open
      • Proximity
    • Neighborhood
    • Outdoor space (residential occupancy)
      • Rental or condo potential
38
SUCCESS STORIES
    • Traditional


    • Contemporary
39
OPPORTUNITY AWAITS